Slab Foundation Repair - What You Should Know

Concrete Pressed Pilings

Foundation Repair with Concrete Pressed Pilings
The concrete pressed piling is probably the most widely used foundation repair pier in the Dallas – Ft. Worth area and was specifically designed for the expansive clay soils that are common to this area. Please click here for terms  regarding this type of foundation repair.

Time Required to Repair
The average repair job can be completed in just one day. This short installation time gives plants that have to be removed to install the piers a chance of survival.

How The Piers Are Installed

  1. A two foot square hole is dug by hand with a shovel. The hole will typically be four or five feet below ground level and will extend under the grade beam of the home to be lifted.
  2. A pre-formed concrete cylinder (6 inches in diameter by 12 inches tall with a ¾ inch hole down the long axis) will be placed at the bottom of the hole directly beneath the grade beam. A 40 ton hydraulic ram will then be placed between the bottom of the grade beam and the top of the concrete cylinder. The ram will then be engaged and the cylinder will be pressed into the ground. Each cylinder will be connected with epoxy and steelrebar. Cylinders will be added and pressed until the point of refusal. That is to a point where it takes more force to press the piling deeper than it does to lift the house. This process is repeated until all the pilings are installed.
  3. Each piling will then be fitted with a concrete cap. The house will then be lifted using 20 ton bottle jacks. The house will be lifted to as near its original position as possible without causing unacceptable damage to the foundation or structure being lifted.
  4. Two cylinders set atop the cap with steel shims used to fill the gap between the bottom of the grade beam and the top of the piling.
  5. The holes will then be backfilled.

Foundation Repair with Concrete Pressed Pilings

Before and After How The Piers Are Installed

Steel Pressed Pilings

Foundation Repair with Steel Pressed PilingsFoundation Repair with Steel Pressed Pilings

The steel pressed pilings can be used in any area where the concrete pressed pilings can be used. They may offer a better solution in areas where the soil is more sandy or where there are thin stringers of harder strata between clay layers. These stringers may cause a “false refusal point” for a concrete piling. The steel piling can penetrate through these shallow stringers. Please click here for terms regarding this type of foundation repair.

Time Required to Repair
As with the pressed concrete pilings, the average steel piling installation can be completed in one day.

How The Pilings Are Installed
The installation process is the same as the pressed concrete piling except instead of a concrete cylinder, Structured Foundation Repairs, Inc. will press one foot sections of double walled Steel Pipe.

Warranty
Structured Foundation Repairs, Inc. offers a Lifetime Transferable Warranty on the pressed steel pilings. It is our intention to permanently stabilize the settlement of the portion of the foundation where piers are installed. (Within a ¼ inch over a 5-foot horizontal span)

slab foundation repair service